How it works

The loop, step by step

The same loop for every trade and every version: set the requirements, check, return, recheck, decide. Pick who you are.

Two workers in hard hats and safety vests look over a concrete element on a job site

For the general contractor

Five steps from a document to a recorded decision

Example: Riverside Medical Office Building, mechanical model from Northline Mechanical.

  1. STEP 1

    Your documents become requirements

    Add the BIM plan, an owner standard, a specification section or a schedule. BIMgravity proposes requirements in plain words, each with its document, section and page. You approve, edit or reject each one. A requirement nobody approved is never checked.

    This document is sent to our AI provider to be read. Your model is not.

    Use case: requirements from a specification
    Project BIM planPDF · 11 requirementsApproved
    Owner asset data standardPDF · 14 requirementsApproved
    Drafted by AIDoor schedule, page 2
    Fire doors carry a fire ratingEach fire-rated opening shall list its rating in the door schedule.
    ApproveEditReject

    42 approved from 4 documents · 4 waiting · 1 rejected

  2. STEP 2

    Check each submission

    Drop a trade model, let the local program pick it up from a watched folder, or read it from Autodesk Construction Cloud. The check runs on your computer. Each point names the document that asks for it.

    Drop a file in the browserIFC 2x3, IFC4, IFC4.3 · every plan
    A watched folder on your computerChecked when a new version lands · Team and Business
    Autodesk Construction CloudRead in your browser, with your own sign-in · Business
  3. STEP 3

    Return it with a correction pack

    The trade gets a link to a correction pack, with no account. It shows what to correct, which document asks for it and how to fix it in Revit. Your documents are not included. A link works for 30 days by default, and you can revoke it.

    Halvorsen Builders · Riverside Medical Office Building6 points to correct · Mechanical, version 4
    New in your file
    21 duct fittings: classification codeOwner asset data standard, 2.3New
    Still open
    18 diffusers and grilles: levelProject BIM plan, 4.4Still open
    Drop your corrected model to recheck it, on your computer.
  4. STEP 4

    Recheck the next version

    The next version runs the same rules. Each point is fixed, still open, new or reopened, so you see progress instead of a new list.

    5 fixed4 still open2 new
    Use case: did the trade really fix it?
    22
    15
    9
    6
    v1 · Oct 15v2 · Oct 23v3 · Nov 4v4 · Nov 12
  5. STEP 5

    Decide and keep the record

    A named person records the decision. An exception has a reason, an approver and an end date. The project board and a one-page meeting summary follow from it.

    AcceptedAccepted with an exceptionReturnedNot decided yet
    Riverside Medical Office BuildingMeeting Fri, Nov 13
    ArchitectureVersion 6Accepted0
    StructureVersion 3With an exception2
    MechanicalVersion 4Not decided yet6
    PlumbingVersion 2Returned11
    ElectricalVersion 1Not decided yet8
    27 open points2 under an exception

For the trade

You open a link. You need no account.

Example: Ryan Kowalski, BIM lead at Northline Mechanical, receives the pack for version 4.

  1. STEP 1

    Open the link from the contractor

    The page says who sent it, for which project, trade and version. Trades never pay and never need an account.

    Correction pack from Halvorsen BuildersRiverside Medical Office Building · Mechanical, version 4
  2. STEP 2

    Read the points to correct

    They are grouped as still open, new in your file and fixed. Each shows the element count, the property and the document that asks for it.

    Still open
    4 air handling units: manufacturerOwner asset data standard, 3.1Still open
    New in your file
    9 VAV boxes: model numberVAV box schedule, sheet M-601New
    Fixed
    Doors: fire rating now filledDoor scheduleFixed
  3. STEP 3

    Fix it in your own tool

    Open the fix steps under a point, or download the file for Revit that selects the elements. The steps are drafts: check each one before you act.

  4. STEP 4

    Recheck before you send

    Drop the corrected model on the same page. It is read in your browser. The recheck is a preview for you: it is not recorded for the contractor and uses no AI. A link allows 20 rechecks a day.

    Drop your corrected model here. Your model file never leaves your computer.
    5 of 6 points now fixedPreview only · not sent to Halvorsen Builders
  5. STEP 5

    Send the new version

    Send version 5 to the contractor the usual way. They run the same rules and record a decision.

    The contractor decidesAccepted, accepted with an exception, or returned