Use case

My requirements are in a specification, not in rules

Add the document. The AI proposes requirements, each with its quote and its page. A person approves each one, and every check uses them.

Opens a sample screen of the product, in a sample firm. No account needed.

BIM Execution Plan, rev C38 pages · added Oct 28 by Dana Ortiz
4 to review
Drafted by AISection 4.2, page 11
Sprinkler heads need a system nameSprinkler heads shall carry the name of the system that serves them.
ApproveEditReject

Nothing is checked until a person approves it.

This document is sent to our AI provider to be read. Your model is not.

The situation

The requirements are in a 38-page PDF, not in a rule file.

The BIM plan says each duct belongs to a named system and each space carries its occupancy. To check that, someone has to turn sentences into rules, and keep them in step with the next revision.

Here you choose the document. The AI proposes the requirements with the sentence they came from, and you decide which ones count.

Who asks this BIM managerGeneral contractor

A printed floor plan at an eighth-inch scale on a table, with pencils, a ruler and a drawing tube

What you do

From a document to approved requirements

  1. Step 1

    Add a document

    The BIM plan, an owner standard, a specification section or a schedule. PDF, plain text or CSV, up to about 200 pages.

  2. Step 2

    Approve, edit or reject

    Each proposal shows the quote and the page. A requirement nobody approved is never checked.

  3. Step 3

    Check every model with them

    Approved requirements run on every new check of the project, for every trade.

What you see

Proposals with their quote and their page

Riverside Medical Office Building: 42 requirements approved from 4 documents, 4 waiting, 1 rejected.

Riverside Medical Office Building / RequirementsSimple view

Requirements

The AI reads your project documents and proposes requirements. A person approves each one.
1
BIM Execution Plan, rev C11 approved · 4 waiting · 1 rejected
4 to review
Owner asset data standard, rev 214 approved
Done
Door schedule, sheet A-6019 approved
Done
Mechanical equipment schedules, M-601 to M-6038 approved
Done

From the BIM Execution Plan · waiting for you

2

Sprinkler heads need a system name

Section 4.2, page 11 · Drafted by AI

ApproveEditReject

“Each duct and pipe segment shall be assigned to a named system. Sprinkler heads shall carry the name of the system that serves them.”

Spaces need an occupancy

Section 4.6, page 13 · Drafted by AI

ApproveEditReject

“Each space shall carry its room number, its name and its occupancy classification.”

Approved, and used by every check

3Ducts belong to a named systemProject BIM plan, section 4.2 · approved by Dana OrtizMechanical v4: 12 ducts to correct
  1. 1Your documents, your requirements4 documents gave 42 approved requirements. The count per document shows what is left to review.
  2. 2The quote and the pageIf the AI misreads a sentence, you see it next to the proposal. You approve, edit or reject it.
  3. 3Then every check uses itAn approved requirement runs on each new version. In mechanical version 4, it found 12 ducts with no system name.

What you get

What you walk away with

Requirements from your own documents

In plain words, each one traced to its document, section and page.

A person decided each one

Approved, edited or rejected by a named person. A rejected proposal stays in the list and is never checked.

What cannot be checked, said plainly

A requirement that needs geometry, such as a clearance, goes to "Cannot be checked automatically". Shown, never guessed.

Where the AI helps

It reads the document you chose. Never the model.

Reading a document is the AI's main job here. It proposes requirements in plain words, with the quote and the page. It never approves one and never computes a count.

Sent to our AI providerThe document you chose to upload, to be read.
Never sentYour model file, its geometry, its identifiers and its names.
Drafted by AIRead a document · proposal

Doors in rated walls need a fire rating

“Doors and walls that form part of a fire-rated assembly shall carry their fire rating.”

BIM Execution Plan, rev C · section 4.7, page 14

ApproveEditReject

Nothing is checked until a person approves it. The counts in a check never come from the AI.

Photos: Unsplash · Lucas Kepner

Start the trial and add your own BIM plan.

The same check on your own projects. 14 days of Team, no card; then Free unless you choose a plan.