Use case

Did the trade really fix what I returned?

The next version runs the same rules. Each point is fixed, still open or new, and a named person records the decision.

Opens a sample screen of the product, in a sample firm. No account needed.

Mechanical model · 4 versionsNorthline Mechanical · Oct 15 to Nov 12
Not decided yet
v1 · Oct 1522v2 · Oct 2315v3 · Nov 49v4 · Nov 126
Version 4 against version 3
5 fixed4 still open2 new
Version 3 returned by Dana Ortiz, Nov 5, 2026

The situation

You returned nine points. Version 4 is back. What changed?

The trade says it is fixed. To know for sure, you would open both versions and compare them, point by point, before Friday's meeting.

BIMgravity runs the same requirements on the new version and sets the two results side by side, so the meeting starts from what changed.

Who asks this BIM managerGeneral contractor

A bright open office with silver spiral ducts and long light fixtures under a wood ceiling

What you do

Recheck, compare, decide

  1. Step 1

    Drop the new version

    It lands on the same model line. The same approved requirements run on it, on your computer.

  2. Step 2

    Read what changed

    Each point is fixed, still open, new or reopened since the version before.

  3. Step 3

    Record the decision

    Accept, accept with an exception, or return it with a new correction pack. Your name and the date go on the record.

What you see

Four versions, one line

The mechanical model from Northline Mechanical, Riverside Medical Office Building.

Riverside Medical Office Building / Mechanical / VersionsSimple view

Mechanical model

Northline Mechanical · Ryan Kowalski, BIM lead · 4 versions since Oct 15
Version 4 not decided yet
1Version 1Oct 1522ReturnedFirst version · Dana Ortiz, Oct 16
Version 2Oct 2315Returned7 fixedDana Ortiz, Oct 26 · proposed by Priya Nand
2Version 3Nov 49Returned8 fixed1 new1 reopenedDana Ortiz, Nov 5
Version 4Nov 126Not decided yet5 fixed4 still open2 newOn the agenda Fri, Nov 13

What changed in version 4 · compared with version 3

3
Fixed5
Fans: manufacturerwas 11
Coils: model numberwas 6
and 3 more
Still open4
Ducts: system name31 → 12
Diffusers: level25 → 18
and 2 more
New2
Duct fittings: classification code21 elements
VAV boxes: model number9 elements
  1. 1From 22 points to 6The open points at each version, counted by the same engine with the project's requirements.
  2. 2Every decision has a nameVersion 3 was returned by Dana Ortiz on Nov 5. A recorded decision is never edited or deleted.
  3. 3Fixed, still open, newEach point is compared with the version before, so the meeting talks about progress, not a new list.

What you get

What you walk away with

Proof of each fix

A point marked fixed is a requirement the same rule now finds met on the new version.

A decision on the record

Accepted, accepted with an exception or returned, with the name, the date and the reason.

A new pack when it is needed

Return the version, and the trade gets the remaining points by link, with no account.

Where the AI helps

It explains the result. You decide.

On request, the AI explains what changed between two versions and drafts the meeting summary, from the counts the engine computed. The decision is recorded by a named person.

Never decidesNever receives the model
Drafted by AIExplain a result · version 4 against version 3

Northline fixed 5 points, among them the manufacturer of the fans and the model number of the coils. 4 points are still open: the air handling units have had no manufacturer since version 1. 2 points are new: duct fittings without a classification code and VAV boxes without a model number.

From the results of version 3 and version 4

The counts come from the check, not from the AI.

Photos: Unsplash · Austin Distel

Start the trial and follow your own trades.

The same check on your own projects. 14 days of Team, no card; then Free unless you choose a plan.