Use case
Is the model ready to hand over to the owner?
The handover check looks at the asset data the owner's facility team needs: manufacturer, model number and system, element by element.
Runs the sample check in your browser: the handover score is the third one. No account needed.
- 9 VAV boxes have no model numberVAV box schedule, sheet M-601New
- 4 air handling units have no manufacturerOwner asset data standard, 3.1Still open
- Equipment has a serial number fieldOwner asset data standard, 3.4Met
The situation
The owner's facility team will run the building from this data.
At handover, the owner expects every air handling unit, VAV box and pump to carry its manufacturer, its model number and its system. A value missing then is a value someone has to find later, in a submittal or on site.
Checked on each version, not at the end, the missing data is still the trade's to add.
Who asks this General contractorOwner

What you do
Check the asset data on every version
- Step 1
Choose what the owner asks for
The COBie (NBIMS-US) rule pack, your owner standard and your equipment schedules.
- Step 2
Check each version
The handover check runs with the other two, on your computer, with a score of its own.
- Step 3
Correct, or accept with an exception
When a value cannot exist yet, record an exception with a reason, an approver and an end date.
What you see
The handover score, element by element
Mechanical model, version 4: 71 %, 5 of 7 handover requirements met, 2 points to correct.
Handover
2 to correct5 of 7 met · COBie (NBIMS-US), owner standard, equipment schedulesOne more handover requirement is met. A requirement that does not apply is left out of the score.
- Reason
- VAV box and air handling unit submittals are still under review.
- Approver
- Dana Ortiz, BIM manager
- Ends
- Feb 12, 2027. On that date the 2 points count as open again.
- 1A score of its own71 %: 5 of 7 handover requirements met. Never averaged with project data or code data.
- 2Element by elementWhich elements miss which value, and which document or rule pack asks for it.
- 3An exception endsIt names the points it covers, a reason, an approver and an end date. Then the points count again.
What you get
What you walk away with
Found on each version, while the trade can still add it to the model.
Nothing is waved through for good. The record shows who approved it, why, and until when.
The PDF record carries the decision, the name, the date and every exception.
Where the AI helps
It explains a point in the owner's words.
On request, the AI explains what a handover point means for the facility team and how to fill the value in Revit. It never says whether a model is ready to hand over.
The owner's facility team uses the model number to match each VAV box to its submittal and to order parts. Fill it in the type properties of the 9 VAV boxes, from the VAV box schedule, sheet M-601, then export again.
From the requirement: VAV box schedule, sheet M-601
Check it before you act. The count and the source come from the check, not from the AI.
Photos: Unsplash · Razlan Hanafiah
Start the trial and check your handover data.
The same check on your own projects. 14 days of Team, no card; then Free unless you choose a plan.