Is the model ready to hand over to the owner?

The handover check looks at the asset data the owner's facility team needs: manufacturer, model number and system, element by element.

Runs the sample check in your browser: the handover score is the third one. No account needed.

71%
Handover · mechanical, version 45 of 7 met · COBie and the owner standard
2 to correct
  • 9 VAV boxes have no model numberVAV box schedule, sheet M-601New
  • 4 air handling units have no manufacturerOwner asset data standard, 3.1Still open
  • Equipment has a serial number fieldOwner asset data standard, 3.4Met
An exception always has an end date.

The situation

The owner's facility team will run the building from this data.

At handover, the owner expects every air handling unit, VAV box and pump to carry its manufacturer, its model number and its system. A value missing then is a value someone has to find later, in a submittal or on site.

Checked on each version, not at the end, the missing data is still the trade's to add.

Who asks this General contractorOwner

An empty office floor near completion, with air grilles and light panels in the ceiling and a wall of windows

What you do

Check the asset data on every version

  1. Step 1

    Choose what the owner asks for

    The COBie (NBIMS-US) rule pack, your owner standard and your equipment schedules.

  2. Step 2

    Check each version

    The handover check runs with the other two, on your computer, with a score of its own.

  3. Step 3

    Correct, or accept with an exception

    When a value cannot exist yet, record an exception with a reason, an approver and an end date.

What you see

The handover score, element by element

Mechanical model, version 4: 71 %, 5 of 7 handover requirements met, 2 points to correct.

Riverside Medical Office Building / Mechanical, version 4 / HandoverSimple view
1
71%

Handover

2 to correct5 of 7 met · COBie (NBIMS-US), owner standard, equipment schedules
2
Element and valueAsked byResultVAV boxes: model number9 VAV boxesSchedule M-601To correctAir handling units: manufacturer4 unitsOwner standard 3.1To correctFans: manufacturerFixed in version 4Owner standard 3.1MetPumps: manufacturerFixed in version 4Owner standard 3.1MetCoils: model numberFixed in version 4Owner standard 3.1MetEquipment: serial number fieldAll equipmentOwner standard 3.4Met

One more handover requirement is met. A requirement that does not apply is left out of the score.

3Example: accepted with an exceptionCovers the 2 handover points: 9 VAV boxes and 4 air handling units.
Reason
VAV box and air handling unit submittals are still under review.
Approver
Dana Ortiz, BIM manager
Ends
Feb 12, 2027. On that date the 2 points count as open again.
  1. 1A score of its own71 %: 5 of 7 handover requirements met. Never averaged with project data or code data.
  2. 2Element by elementWhich elements miss which value, and which document or rule pack asks for it.
  3. 3An exception endsIt names the points it covers, a reason, an approver and an end date. Then the points count again.

What you get

What you walk away with

A list of what is still missing

Found on each version, while the trade can still add it to the model.

Exceptions with an end date

Nothing is waved through for good. The record shows who approved it, why, and until when.

A record you can share

The PDF record carries the decision, the name, the date and every exception.

Where the AI helps

It explains a point in the owner's words.

On request, the AI explains what a handover point means for the facility team and how to fill the value in Revit. It never says whether a model is ready to hand over.

Never decidesNever receives the model
Drafted by AIExplain a point · VAV boxes: model number

The owner's facility team uses the model number to match each VAV box to its submittal and to order parts. Fill it in the type properties of the 9 VAV boxes, from the VAV box schedule, sheet M-601, then export again.

From the requirement: VAV box schedule, sheet M-601

Check it before you act. The count and the source come from the check, not from the AI.

Photos: Unsplash · Razlan Hanafiah

Start the trial and check your handover data.

The same check on your own projects. 14 days of Team, no card; then Free unless you choose a plan.